R2v3 Certified Recycler · Reviewed on Gartner Peer Insights

Data Center Recycling Services from ITAMG

Data center recycling from IT Asset Management Group (ITAMG) processes retired servers, storage, networking and related equipment for reuse and materials recovery. Power and cooling equipment needs a separately confirmed scope. Across all 50 states, ITAMG destroys the data, recovers what still holds value, and routes the remainder into certified commodity streams under R2v3, NAID AAA, and RIOS.

Zero Landfill, Tracked to Final Disposition

ITAMG's documented zero-landfill policy governs every stream, and R2v3 downstream vendors are audited to final disposition.

Batteries, CRAC Units, PDUs, and Cabling

List UPS battery strings, cooling units, busway and bulk copper separately so acceptance, handling and required records can be confirmed.

Data Treatment at the Agreed Location

NIST 800‑88-aligned wiping, degaussing, and NAID AAA shredding, on site or at the facility.

48-Hour Quotes, Nationwide Pickup

Line-item quotes typically within 48 hours. ITAMG crews de-rack and pack in all 50 states.

Certified, Documented Data Center Recycling

Free, no-obligation ITAMG quotes for data center recycling, equipment removal, and data destruction. Line-item pricing, typically within 48 hours.

5.0 Gartner Peer Insights
4.9 Google Reviews 100+ reviews
A+ Better Business Bureau
R2v3 NAID AAA RIOS NIST 800‑88 SOC 2

Certified: R2v3, NAID AAA, RIOS  ·  Compliant: NIST 800‑88, SOC 2

Trusted By FORTUNE 500

Get a Data Center Recycling Quote

Working hardware in the project can offset or eliminate your data center recycling costs.

Certified data destruction · R2v3, NAID AAA, RIOS · Aligned to NIST SP 800-88 Rev. 2 · Typical quote: 2 business days after scope confirmation
We found ITAMG while researching for a recycling provider to help with a nationwide refresh project... We get the reporting we need, and they are able to obtain and return great value from the assets we are recycling.
IT Services, IT Services, 50M-250M USD · Source: Gartner Peer Insights
01

The ITAMG Service

What Is Data Center Recycling?

ITAMG recycles retired data center IT equipment, treats its data, recovers reusable hardware and documents final disposition.

Data center recycling is the processing of retired data center equipment for reuse and materials recovery. ITAMG sanitizes or shreds the drives, grades servers and networking for reuse, then separates steel, copper, aluminum, and precious-metal-bearing circuitry into certified commodity streams. Batteries, cooling units, and power distribution hardware follow their own regulated paths. ITAMG’s documented zero-landfill policy and downstream tracking govern the accepted recycling streams.

IT Asset Management Group (ITAMG) is an R2v3 certified electronics recycler serving enterprises nationwide. Where ownership and security requirements permit reuse, ITAMG grades hardware before materials recovery. Your team gets the certificates auditors ask for without assembling the paper trail itself.

Data Center Recycling vs. Decommissioning: Which Do You Need?

These two get used interchangeably, and they are different jobs. The distinction decides which team you need and what the quote covers.

Data center decommissioning is the site-level project: sequencing the shutdown, coordinating with building management, de-installing, and handing a facility back on the lease date.

Data center recycling is what happens to the hardware itself: data destruction, reuse grading, materials recovery, and the environmental record that closes the file.

A refresh may need equipment processing and collection. A facility exit also needs release approvals, removal coordination and an agreed handback scope. Recycling can form part of that wider engagement. Read the data center decommissioning guide to define the scope, or review ITAMG’s decommissioning services for project delivery.

02

The ITAMG Process

How ITAMG's Data Center Recycling Process Works

Six steps define data center recycling at ITAMG: quote, scheduling, removal, chain of custody, data destruction, and final certification. ITAMG coordinates the agreed work through one point of contact and more than 3,000 enterprise pickups companywide each year. Each step hands evidence to the next, and the closing certificate set documents every serial.

01

Request a line item quote

Send an inventory export, or photos and rack elevations if no list exists. ITAMG returns a free, no-obligation quote priced line by line, separating the data-bearing hardware from the infrastructure. Flag any serials that are leased, under warranty, or vendor-managed and the plan segregates them.

02

Schedule the pickup

ITAMG supplies the paperwork building management and legal ask for: certificate of insurance, insurance documentation, and an MSA or NDA on request. Pickup timing depends on inventory, site readiness, access and the agreed schedule. Flag refresh or colocation deadlines during scoping.

03

Removal and de-racking

Background-checked ITAMG technicians disconnect, label, pack, and palletize on site. Agree cabinet and cabling removal in the scope. Battery handling and specialist disconnections require their own confirmed procedures and responsibilities. Freight elevators and buildings with no loading dock are routine work.

04

Chain of custody in transit

Equipment travels in sealed containers on ITAMG's GPS-tracked, insured vehicles. Custody is documented at every handoff, from your cage to the processing floor, and the transfer documentation becomes part of your project record.

05

Data destruction

ITAMG wipes drives to NIST 800‑88-aligned standards, degausses them, or shreds them under NAID AAA controls, on site through the mobile fleet or at the R2v3 certified facility. You choose the method and the location. The certificate documents both, per serial.

06

Certificates, settlement, and reporting

The agreed closeout package includes the applicable serialized treatment records, Certificates of Recycling and settlement report, available through a 24/7 secure client portal. Sustainability teams pull the same documents auditors do.

The sequence follows the approved treatment location: on-site data treatment precedes shipment; off-site treatment follows secure transport and receiving. Quotes are free and carry no obligation, typically within 2 business days after inventory and scope are confirmed. Agree project dates during scoping. Use the data center decommissioning plan to record inventory, approvals, custody and closeout requirements.

03

The ITAMG Scope

What Data Center Equipment Does ITAMG Recycle?

Use these eight equipment classes to build your recycling inventory: servers, storage, networking, GPU compute, UPS and batteries, power distribution, cooling, and racks and cabling. ITAMG confirms the accepted equipment and processing scope. Identify battery cabinets, CRAC units, busway and bulk copper separately so specialist handling, responsible contractors and required records are agreed before removal.

Rack, blade, and tower servers

Dell PowerEdge, HPE ProLiant, Cisco UCS, Lenovo ThinkSystem, IBM, Oracle, Supermicro, working or dead.

Storage arrays and disk shelves

Dell EMC, NetApp, HPE, Hitachi and Pure Storage, with drive treatment and serialized records matched to the approved disposition.

Switches, routers, and optics

Cisco, Juniper, Arista, Palo Alto Networks, plus firewalls, load balancers, transceivers, and patch panels.

GPU and AI compute

Nvidia DGX, HGX, A100, H100, and L40 systems, plus accelerated PowerEdge and Apollo chassis from refresh cycles.

UPS systems and battery strings

List lithium-ion and VRLA strings, battery cabinets and rack BBUs with their chemistry and condition. Confirm acceptance, classification, packaging and the downstream route.

PDUs, busway, and power distribution

Rack and floor PDUs, remote power panels, busway sections, transformers, and the copper feeder inside them.

CRAC, CRAH, and cooling infrastructure

List computer room air handlers, in-row coolers, condensers and liquid-cooling loops separately. Confirm any refrigerant recovery, qualified contractor and processing route.

Racks, cabinets, cabling, and copper

Enclosures, containment, ladder rack, raised floor tile, and the structured cabling pulled out with them.

ITAMG handles working and non-working IT equipment, with no minimum or maximum quantities, across 150+ hardware brands. Confirm acceptance of damaged batteries, contaminated equipment and specialist infrastructure during scoping. Record media and tape separately in the inventory and custody records.

04

The ITAMG Safeguard

How Data Center Data Is Destroyed Before Recycling

ITAMG sanitizes data center drives with NIST 800‑88-aligned wiping and destroys end of life media with NAID AAA certified shredding, verified per serial. The governing standard, NIST SP 800‑88, moved to Revision 2 in September 2025, and it defines three levels of sanitization.

Sanitization levelWhat NIST SP 800‑88 Rev. 2 means by itTypical use in a data center
ClearLogical techniques that sanitize all user-addressable storage against simple, non-invasive recoveryDrives staying inside your environment
PurgePhysical or logical techniques that make recovery infeasible even with state-of-the-art laboratory methodsDrives leaving your control for reuse or resale
DestroyRenders recovery infeasible and leaves the media unable to store data againEnd-of-life drives, arrays, and tape

Wipe or Shred, On Site or at the Facility

Your security requirements determine the approved method and location; the quote prices the agreed options. ITAMG's mobile fleet has capacity to shred up to 3,500 drives an hour. Its R2v3 certified facility has five industrial shredders and capacity for 30,000 drives a day. ITAMG can shred flash media to a 2mm particle size. Confirm media suitability, required assurance and any witnessing arrangement for your project.

Physical destruction is the end of life path. Wiping is the reuse path, and ITAMG's NIST 800‑88-aligned lines sanitize more than 2,000 drives a day for units headed back to service. Degaussing applies to suitable magnetic media, not SSDs. A technique or particle size alone does not establish that the required sanitization assurance has been met; confirm the method, media and result validation.

Serialized tracking

of data-bearing devices, from your cage to the final certificate

A data center load hides data in places a manifest misses: spare drives in a cabinet drawer, a decade of backup tape, boot media inside a switch. ITAMG's serialized chain of custody exists so no one on your team has to reconstruct where any of it went.

Agree the applicable data center recycling records before work begins:

  • Serialized Certificate of Destruction listing each device, method, and date
  • Certificate of Recycling covering downstream accountability to final disposition
  • Settlement and disposal report formatted for your audit file
  • 24/7 portal access to every document

ITAMG's documentation format is open for compliance officers to review before the first pickup, so nothing about the paperwork is a surprise at close.

05

The ITAMG Outcome

What Happens to Your Data Center Equipment After Pickup

Where ownership and security requirements allow reuse, ITAMG grades eligible units before separating the remainder into metals, boards, plastics and regulated streams tracked to final disposition.

Recycling is the last stop, not the first. Reuse can preserve equipment value; grading follows the approved security and disposition decisions. What cannot be reused becomes material, and material has a documented destination.

Reuse and remarketing

Tested, graded, and returned to service. Recent-generation servers, switches, and optics usually clear this bar, and the credit lands on your settlement report.

Component recovery

CPUs, ECC memory, PSUs, RAID controllers, and optics pulled for the secondary market when the chassis has no value left.

Metals recovery

Steel and aluminum from chassis, racks, and containment. Copper from busway, feeder, and structured cabling, baled and sold into permitted smelters.

Circuit board and precious metals

Boards carrying gold, silver, palladium, and copper are separated and sent to refiners rather than shredded into mixed scrap.

Battery and regulated streams

Battery handling depends on chemistry, condition and applicable classification. Confirm the approved recycler and any required refrigerant recovery for cooling equipment before processing.

The record that closes it

Certificates and a settlement report document what was destroyed, what was recovered, and where each stream terminated.

3M+ Pounds Recycled Yearly
1,500+ Tons of IT Equipment Processed
150+ Hardware Brands Handled
0 Sent to Landfill

ITAMG recycles more than 3 million pounds of e-waste a year across its operations, under a documented zero-landfill policy, with R2v3 downstream partners audited to final disposition.

06

The ITAMG Record

Environmental and Regulatory Compliance

ITAMG handles the environmental duties that attach to retired data center hardware, from landfill bans and hazardous-waste rules to the documentation your ESG reporting needs.

Retired data center hardware carries obligations that outlive the equipment. Some are federal, some are state, and the ones that bite hardest are usually attached to the parts nobody thinks of as IT.

State landfill bans

State disposal rules vary by equipment and location. Confirm the requirements that apply to your load and retain records of its accepted processing route.

Batteries under RCRA

Battery classification and handling depend on chemistry, condition and applicable rules. Some batteries qualify for universal-waste management; confirm the accepted route and documentation for your project.

Data privacy obligations

Where HIPAA, GLBA or other requirements apply, define retention, approved treatment and the evidence your organization needs before releasing media.

Refrigerant handling

For refrigerant-bearing equipment, confirm the applicable recovery requirements, qualified contractor and responsibility for the work before removal. Include these services explicitly in the scope.

Documentation Your ESG and Audit Teams Can Use

Sustainability reporting needs evidence, not assurances. ITAMG's Certificate of Recycling and settlement report support review of the equipment's disposition. Agree the quantities, destinations, reporting format and delivery dates your ESG and audit teams need.

ITAMG holds EPEAT Champion status and RIOS certification, which folds quality, environmental management, and worker safety into one audited framework. ITAMG’s zero-landfill claim rests on its documented policy together with R2v3 downstream tracking to final disposition.

ITAMG carries data and pollution liability insurance. Review coverage and contractual responsibilities during scoping; collection and insurance do not by themselves discharge your organization’s obligations.

07

The ITAMG Standard

Certifications and How to Vet a Data Center Recycler

ITAMG's certifications, R2v3, NAID AAA, and RIOS, verify data security, environmental controls, and downstream accountability under third-party audit.

R2v3

Certified since 2022. R2v3: downstream vendors are vetted and every stream is tracked to final disposition.

NAID AAA

Covers data erasure and physical destruction, verified through scheduled and unannounced audits. NAID AAA: every device's destruction is verifiable down to the serial number.

RIOS

One integrated standard for quality, environmental management, and worker safety. RIOS: three management systems audited as one recycling framework.

ITAMG is also SOC 2 compliant and aligns its sanitization procedures with NIST 800‑88 Rev. 2. Those are compliance frameworks rather than certifications, and the distinction matters when an auditor asks for the artifact behind the claim.

Five Questions Worth Asking Any Recycler

  • Can you produce a current R2v3 or e-Stewards certificate that verifies in the standard's public directory?
  • Are you NAID AAA certified for the destruction work itself, not just the transport?
  • Who physically performs the removal, and are they your employees or a subcontractor?
  • Do you carry pollution liability insurance as well as data liability?
  • Will you show a sample serialized report before the first pickup?

ITAMG provides its credentials and a sample report for review. Background-checked technicians perform the agreed removal work. Confirm the personnel, facilities and any specialist contractors responsible for each stage.

A recycler without third-party audits is asking you to take the chain of custody on faith, and the disposal duty stays with your organization either way.

08

The ITAMG Proof

Data Center Recycling Customer Reviews

According to Gartner Peer Insights, ITAMG holds a 5.0 rating based on verified customer reviews. ITAMG also maintains a Better Business Bureau A+ rating with zero complaints filed.

Gartner
5.0 Read Our Reviews
Google
4.9 100+ Reviews

Security, Compliance, and Environmental Responsibility in One Vendor

"ITAMG' IT disposition services delivers a strong combination of security, compliance and environmental responsibility"

Data Security Protocols Followed, Asset Recovery Value Maximized

"They handled our IT equipment with care and ensured that data security protocols were followed and a commitment to maximizing asset recovery value. The team is always available to answer any questions I have. The reassurance of maximum asset value and data security measures makes the services provided by ITAMG aligned with the principles of responsible business conduct."

Handles Custom Enterprise Needs

"Being such a large organization with many custom needs, this company does it all with the highest quality and knowledge in the industry"

Fair Returns on Assets Across More Than 15 Years

"I've had the pleasure of working with ITAMG for well over 15 years and their service has consistently exceeded expectations. Their professionalism, fair returns on assets and top-notch customer service makes them an exceptional partner and leader in IT asset disposal."

ITAMG maintains a 5.0/5.0 rating on Gartner Peer Insights and a 4.9 on Google. Read Our Reviews on Gartner

GARTNER is a registered trademark and service mark of Gartner, Inc. and/or its affiliates in the U.S. and internationally, and PEER INSIGHTS is a registered trademark of Gartner, Inc. and/or its affiliates and are used herein with permission. All rights reserved. Gartner Peer Insights content consists of the opinions of individual end users based on their own experiences with the vendors listed on the platform, should not be construed as statements of fact, nor do they represent the views of Gartner or its affiliates. Gartner does not endorse any vendor, product or service depicted in this content nor makes any warranties, expressed or implied, with respect to this content, about its accuracy or completeness, including any warranties of merchantability or fitness for a particular purpose.

09

The ITAMG Approach

Recycle, Resell, or Redeploy: Choosing the Right Path

ITAMG grades each unit before quoting, so recent hardware prices as buyback and only true end of life equipment prices as data center recycling.

Redeploy First choice

Units still compatible with your environment, wiped to NIST 800‑88 and returned to service.

Resell Preferred

Recent-generation servers, storage, switches, and optics with a secondary market, handled through buyback.

Component recovery Recommended

Mixed lots where CPUs, memory, drives, and transceivers hold value even when the chassis does not.

Certified recycling Recommended

End-of-life hardware, damaged units, batteries, cooling equipment, cabling, and stripped enclosures.

Dumpster or scrap hauler Never

Unverified disposal can leave data and downstream outcomes undocumented. Confirm applicable disposal rules, custody and the receiving facility.

Grading decides the economics, which is why ITAMG runs triage before the shredder. Agreed recovery value may offset project fees, depending on the inventory, condition and commercial terms. When resale is the goal for a working fleet, ITAMG's server and storage buyback service handles valuation and payment directly.

For buyback planning, ITAMG estimates used IT equipment depreciation at 3 to 5% per month. Actual recovery depends on configuration, condition and market demand.

10

Line-Item Pricing

How Much Does Data Center Recycling Cost?

With ITAMG, recovery credits may offset part or all of the data center recycling cost. Net proceeds depend on the resale value and agreed destruction, removal and special-handling fees.

There is no flat rate, because no two data centers hold the same mix. The quote nets two opposing lines, and which one wins depends on what is still worth something.

What drives fees up

Battery cabinets, cooling equipment with refrigerant, bulk cabling pulls, on-site destruction, no loading dock, and loads that are entirely end of life.

What drives credits up

Recent-generation servers and switches, populated memory and CPUs, GPU compute, and copper volume. The quote shows whether estimated credits exceed the fees.

Line-item transparency

Every charge and every credit appears as its own line on the quote you approve before pickup, with a stated process for approving scope changes.

The settlement report nets both sides, so finance sees one clear offset rather than an invoice surprise. ITAMG quotes also align to procurement windows: fiscal-cutoff and year-end pickups book out in advance, so early requests hold their dates.

11

The ITAMG Difference

Why Enterprises Recycle Data Centers With ITAMG

ITAMG combines certified destruction and documented equipment disposition under an agreed scope and one point of contact.

Zero Landfill, Tracked to Final Disposition

A documented zero-landfill policy plus R2v3 downstream accountability. The claim rests on an audited mechanism, not a badge.

3M+ Pounds Recycled Every Year

1,500+ tons of IT equipment processed across 150+ hardware brands, at a 25,000+ square foot R2v3 certified facility.

NAID AAA for Erasure and Destruction

Certified for both methods, audited on schedule and unannounced. Every device's destruction is verifiable down to the serial number.

26+ Years. Zero Reported Data Breaches.

More than 13 million IT assets processed since 1999 without a reported breach, across 25,000+ completed projects.

Reviewed on Gartner Peer Insights

A 5.0 out of 5.0 rating on Gartner Peer Insights from verified customer reviews, plus 4.9 on Google and a BBB A+ record.

Pollution and Cyber Liability Insured

Coverage spanning pollution, cybersecurity, general liability, and errors and omissions. Review the policy coverage and contractual responsibilities for your project.

ITAMG applies the same certified process with no minimum and no maximum quantity, so a single retired cabinet moves through the identical chain of custody as a full data center.

12

The ITAMG Operation

Inside ITAMG's Recycling Facility

ITAMG's 25,000+ square foot facility in New York runs five industrial shredders with R2v3 certified operations and serialized intake.

26+ Years in Business
13M+ IT Assets Processed
30,000 Drives per Day: Facility Capacity
0 Reported Data Breaches

Every incoming pallet is received against its manifest, and each data-bearing device is logged by serial before processing begins. ITAMG has processed more than 13 million IT assets across its operations with zero reported data breaches. Compliance teams are welcome to review the intake and documentation process before committing to a first pickup.

13

The ITAMG Coverage

Data Center Recycling Across All 50 States

ITAMG is a nationwide data center recycling provider serving enterprises in all 50 states under one certified process and one point of contact. Projects run from ITAMG's New York-metro headquarters, and packaging, removal, and transport are included, so nothing needs to reach a drop-off site. Colocation cages, on-premise server rooms, and edge sites are all standard work, and multi-site programs retain site and shipment identifiers so reporting can be consolidated without losing individual custody records. Deadline-driven schedules are routine: refresh cutoffs, colocation contract dates, and consolidation milestones set the calendar.

For site access and customer-space planning, use ITAMG’s decommissioning locations and colocation operator resources.

14

The ITAMG Answers

Frequently Asked Questions About Data Center Recycling

ITAMG answers the questions enterprises ask most about data center recycling, from cost and scope to data destruction, batteries, and compliance paperwork.

How much does data center recycling cost?

Working-equipment recovery credits may offset part or all of ITAMG’s data center recycling fees. Any net proceeds depend on the inventory and agreed costs. Fees rise with battery cabinets, cooling equipment, and loads that are entirely end of life. Every charge and credit appears as a line item on the quote you approve before pickup.

Does ITAMG recycle UPS batteries, CRAC units, and PDUs?

Include UPS systems, battery strings, CRAC and CRAH units, in-row coolers, PDUs, busway, transformers, raised floor and bulk cabling in a separate inventory for scope review. ITAMG confirms acceptance and the responsible specialists before work is scheduled. Battery classification, refrigerant recovery, disconnection and transport requirements depend on the equipment and location.

What is the difference between data center recycling and decommissioning?

Data center decommissioning is the site-level project of taking a facility offline: sequencing, coordination, de-installation, and lease handback. Data center recycling is what happens to the hardware itself, covering data destruction, reuse grading, materials recovery, and environmental documentation. ITAMG performs both, and the recycling runs the same way inside a decommissioning project.

How does ITAMG destroy the data before recycling?

ITAMG destroys data by NIST 800‑88-aligned wiping and degaussing, or NAID AAA physical shredding, on site through the mobile fleet or at its R2v3 certified facility. Flash media selected for physical destruction can be shredded to 2mm; confirm suitability against the approved requirements. Media treatment is documented against identifiers and the agreed requirements. Review sample records during scoping to confirm the evidence your organization needs.

What documentation do I receive?

Your agreed scope determines the applicable records: serialized media treatment results, Certificates of Destruction or Recycling, and a settlement report where recovery applies. ITAMG provides the records through a 24/7 secure client portal in the agreed format.

What actually happens to the recycled material?

Where ownership and security requirements permit reuse, ITAMG grades eligible hardware before separating the remainder into commodity streams. Steel and aluminum come from chassis and racks, copper from busway and cabling, and circuit boards carrying gold, silver, and palladium go to refiners rather than mixed scrap. Batteries and refrigerant-bearing equipment require confirmed handling routes. ITAMG’s documented zero-landfill policy and downstream tracking govern accepted recycling streams.

Is it legal to throw data center equipment in a dumpster?

Do not treat a dumpster pickup as evidence of secure or compliant disposition. Requirements vary by equipment and location, and batteries may need separate handling. Confirm the processing route, data treatment and records before releasing the load. Certification does not by itself eliminate your organization’s obligations.

Can I sell equipment instead of recycling it?

Recent-generation servers, storage, switches, and GPU compute usually carry resale value, and ITAMG grades the fleet before quoting, so those units price as buyback rather than disposal. A project can turn into a payout when enough of the fleet still works. ITAMG's buyback service handles valuation and payment directly.

How long does data center recycling take?

ITAMG typically returns data center recycling quotes within 48 hours. Confirm pickup and processing dates against the inventory, site readiness and access requirements; flag any refresh or colocation deadline during scoping. Processing and final documentation follow through the client portal as each batch completes.

What certifications should a data center recycler have?

A qualified data center recycler holds current R2v3 or e-Stewards certification, verifiable in the standard's public directory, plus NAID AAA for the destruction work itself. ITAMG holds R2v3, NAID AAA, and RIOS, is SOC 2 compliant, and carries insurance covering both data and pollution liability.

Does ITAMG recycle broken or incomplete equipment?

ITAMG recycles data center equipment in any condition: dead boards, missing drives, stripped chassis, water damage, single units or full rows. Non-working hardware routes to component recovery and certified commodity processing rather than resale. There is no minimum quantity, so one retired cabinet qualifies the same way a full data center does.

Where does ITAMG provide data center recycling?

ITAMG provides data center recycling in all 50 states, with GPS-tracked pickups dispatched from its New York-metro headquarters and facility. Packaging, removal, and transport are included on every project. Colocation cages, on-premise server rooms and multi-site programs retain site and shipment identifiers within consolidated project reporting.

Secure. Certified. Documented.

Recycle Your Data Center with ITAMG

Request an ITAMG quote for servers, storage and networking equipment. List batteries, cooling equipment and cabling separately so the accepted scope and specialist work can be confirmed. Data destruction follows NIST 800‑88, with certified wiping for reuse-bound drives and NAID AAA shredding for end of life media, and every device is documented by serial. Free ITAMG quotes, no obligation, typically within 2 business days after inventory and scope are confirmed.

Certified R2v3 NAID AAA RIOS Compliant NIST 800‑88 SOC 2
26+
Years in Business
3M+
Pounds Recycled Yearly
0
Reported Data Breaches
50
States with Coverage
Get a Recycling Quote