Reviewed on Gartner Peer Insights

Data Center Decommissioning Services
From ITAMG

Data center decommissioning services from ITAMG serve enterprises, colocation providers, and hyperscale operators across all 50 states, from a single rack to multi-site projects. ITAMG crews do the physical work on site: de-racking servers, storage arrays, network gear, racks and power infrastructure, then packing and moving your equipment under documented chain of custody. The agreed scope covers NAID AAA certified data destruction, eligible asset recovery and serialized project reporting. ITAMG processes hardware from 150+ manufacturers, including Dell, HPE, Cisco and Nvidia.

We Pay For
Data Center Equipment

Resale-eligible data center IT assets priced by line item against secondary-market demand.

Data Destroyed
On Every Drive

NAID AAA certified erasure or shredding, at your site or ITAMG's.

Certified From
Rack To Recycling

Serialized audit and compliance report on every device.

Trusted By FORTUNE 500
Decommission Your Data Center

ITAMG decommissions single racks to entire facilities nationwide. Free, no-obligation quotes typically within 2 business days after inventory and scope are confirmed.

Gartner 5.0 Read Our
Reviews
Google 4.9 100+ Verified
Reviews
BBB A+ Accredited
Business
13M+
IT Assets Processed
Zero
Reported Data Breaches
2 Business Days
Typical Quote Turnaround
R2v3 NAID AAA RIOS NIST 800-88 SOC 2
Purnam Kushwaha Senior Manager, Strategy, Wish

ITAMG successfully managed the decommissioning of Wish's infrastructure across our Equinix and CoreSite data centers, completing the entire project in just 10 days, well ahead of schedule. After evaluating more than 40 companies, I can confidently say they offered the best market value. Their integrity also stood out by identifying additional inventory that was not part of our original scope and compensating us an additional $250,000 for it. I highly recommend ITAMG for their speed, execution, transparency, and professionalism.

THE ITAMG MODEL

Data Center Decommissioning, Covered End to End

ITAMG manages the entire decommissioning project, end to end, in all 50 states, from de-racking a single server room to clearing hyperscale facilities. Data center decommissioning is the managed retirement of a facility's IT infrastructure, and the work runs four streams at once: data destruction, logistics, value recovery, and compliance. With ITAMG, one project manager owns it from first contact through final documentation, and the same person answers for the schedule, the custody records, the recovered value, and the reporting. Your team gets one point of contact, one chain of custody, and one company accountable for the entire project.

Your team retains workload, retention and release approvals. Specialist facility work and the required handback condition are agreed in the statement of work. For scope, costs and provider evaluation, use the data center decommissioning guide.

Data destruction

Wiped or shredded under NAID AAA

Retired servers, storage arrays, and loose media are sanitized on site or at ITAMG's facility, each drive following NIST 800-88 Rev. 2 and certified by serial number.

Logistics

Own crews de-install and crate

Background-checked ITAMG technicians handle the de-racking and equipment removal. Secure, insured transport then carries every load under documented chain of custody.

Value recovery

Tested, graded, remarketed

Every data center asset is priced against secondary-market data and quoted line by line, so the recovery number is auditable instead of a lump sum.

Compliance

R2v3 downstream, tracked to final disposition

Certificates, manifests, and disposition records land in one portal, mapped serial by serial so an auditor can trace any device or drive.

THE ITAMG PROCESS

ITAMG's Data Center Decommissioning Process

You
Approve the scope
ITAMG
Performs agreed work
You
Receive the certificates

The data center decommissioning process at ITAMG runs seven documented steps from scoping to certified closeout under documented chain of custody. Your team approves the inventory, workload release, data requirements and project plan. Use the data center decommissioning plan and checklist to prepare those approvals and records. On-site data treatment precedes shipment; off-site treatment follows secure transport and receiving.

Phase 1PlanYou approve
01

Scope and quote

Scoping starts with a rack count or asset export, though a site walkthrough works just as well. Your team identifies the applicable requirements, including HIPAA, GLBA, SOX or state privacy law where relevant. ITAMG confirms the contracted controls and assigns one project manager for the engagement.

Serial-level asset inventory and discoveryAudit and reconciliation baselineQuote typically within 2 business days after scope confirmation
02

Lock the plan

You approve the schedule, the access and escort windows, and the phasing before any crew arrives. ITAMG sequences work around production floors that stay live, and holds one timeline across every location on multi-site programs.

Power-down and shutdown sequence agreedOne project office from a single server room to hyperscaleProject plan with dates and named owners
Phase 2ExecuteITAMG performs
03

Destroy the data

Every data-bearing drive is wiped or shredded under NAID AAA, with the method matched to the NIST 800-88 Rev. 2 level the data calls for. The work runs at your facility or at ITAMG's, and the quote prices both so the choice stays yours.

Clear, Purge and Destroy levels supportedWitnessed destruction on requestPer-serial destruction log
04

Remove and ship

Once your shutdown sequence completes, crews de-install the floor: racks emptied, cabling mined, equipment packed and crated. Loaded gear then moves to the ITAMG processing facility on GPS-tracked, insured vehicles.

Background-checked crewsChain of custody documented from dock to facilityProject reporting in the 24/7 client portalSerialized removal manifest
Phase 3CloseYou receive
05

Recover value

Resale-eligible hardware is tested, graded and remarketed through established channels, and whatever it earns is credited against the cost of your project. Recovery may offset part or all of the agreed project cost.

Recovery assessed against your equipment inventoryLease-return and redeployment in the same passValuation and appraisal report
06

Recycle the remainder

Hardware with no market value goes to R2v3 certified downstream partners and is tracked to final disposition. ITAMG's documented zero-landfill policy covers the diversion, backed by 3M+ lbs of e-waste processed a year.

ITAMG’s annual recycling figure covers its companywide operations. See data center recycling services for the processing and reporting scope.

Downstream vendor due diligenceWeight and diversion reportingCertificates of recycling
07

Certify and close

Closeout arrives as a document package, not a phone call. The project closes against the site condition and documentation agreed in the statement of work. Any restoration work and its responsible contractor must be specified.

Full reconciliation against the opening inventorySerialized Certificates of Destruction and RecyclingAudit-ready closeout package in the 24/7 portal
THE ITAMG COVERAGE

Data Center Equipment We Decommission and Buy Back

ITAMG decommissions data center IT equipment and buys back hardware that still holds market value. ITAMG processes 150+ hardware brands across its operations. Include power and cooling equipment in the inventory so acceptance, specialist work and the removal scope can be confirmed.

Servers
GPU / AI
Storage
Networking
Components
Media
Power
End-User
Dell server and IT equipment buyback HPE ProLiant server and IT equipment buyback Cisco networking and UCS server buyback IBM enterprise IT equipment buyback NetApp storage equipment buyback EMC storage and data center equipment buyback Nvidia GPU buyback Supermicro server buyback Lenovo server and laptop buyback Juniper Networks networking equipment buyback Brocade networking equipment buyback

Servers and Mainframes

Dell PowerEdge, HPE ProLiant, Cisco UCS, Supermicro, plus IBM and Oracle mainframes. Legacy platforms decommission alongside current fleets.

Dell PowerEdgeHPE ProLiantCisco UCSIBM + Oracle Mainframe

GPU and AI Systems

Nvidia DGX, HGX, A100, H100, and L40 platforms. GPU systems retain resale value that buyback returns to the project budget.

Nvidia DGXHGXA100 / H100L40

Storage Arrays

NetApp, Dell EMC, Pure Storage, and HPE arrays. Every data-bearing device is sanitized or destroyed with per-serial verification.

NetAppDell EMCPure StorageHPE Arrays

Network Equipment

Cisco Catalyst and Nexus, Juniper, Arista, and Palo Alto. Configurations, stored credentials and embedded media follow the approved treatment method and location.

Cisco Catalyst / NexusJuniperAristaPalo Alto

Components

Intel Xeon and AMD EPYC processors, ECC memory, NVMe and SAS drives, RAID controllers, and power supplies recovered at line level.

Intel XeonAMD EPYCECC MemoryNVMe / SAS

Media and Tape

Backup tapes, DLT, and loose drives. Shredding, degaussing, and certificates close out the media archive with the facility.

Backup TapeDLTDegaussingShredding

Power and Cooling Infrastructure

List UPS units, PDUs, CRAC units, rack enclosures and liquid cooling systems separately. Confirm ownership, acceptance and qualified disconnection or recovery contractors in the scope.

UPSPDUCRACLiquid Cooling

End-User and Peripheral Devices

Laptops, desktops, and monitors swept in facility clear-outs, processed under the same certificates as the racks.

LaptopsDesktopsMonitorsPeripherals
Since 1999 · Lifetime Milestones
26+
Years in Business
13M+
IT Assets Processed
25,000+
Projects Completed
Zero
Reported Data Breaches
THE ITAMG SCALE

ITAMG Data Center Decommissioning by the Numbers

ITAMG’s companywide operating record supports its data center decommissioning services. Since 1999, ITAMG has completed 25,000+ projects, with zero reported data breaches. Service coverage spans all 50 states.

ITAMG Operating Milestones:
500,000+
Enterprise IT Assets Processed
3M+
Pounds of E-Waste Recycled per Year
200,000+
End-User Devices Processed
150+ Hardware Brands Processed
6,000+
Enterprise Servers Processed per Year
3,000+
Enterprise Pickups Coordinated per Year
1,500+
Tons of IT Equipment Processed
20,000+
Apple Devices Processed
THE ITAMG PROJECT PROFILES

Data Center Decommissioning Case Studies

ITAMG completed the three data center decommissioning projects below. The clients are not named. Each study shows what was on site, how the work was scheduled, how every drive was handled, what the project cost, and what the client was paid back. All three finished on schedule. In all three, what ITAMG paid the client was more than the project cost.

Financial services · Multi-site consolidation

How a regional bank cleared four sites and reconciled 2,341 assets

Across two owned data centers and two rented colocation cages, ITAMG reconciled asset-tag and serial-number records that did not share a common key.

$1.19MClient recovery credited to the bank
9,412Drives destroyed on site
ZeroUnresolved inventory exceptions
Read the full case study →
Healthcare · Working hospital

How a health system cleared 52 racks and cabinets without moving readable media off-site

ITAMG planned night work around clinical access, destroyed media at each originating site and handed 1,900 square feet back on schedule.

4,515Drives and tapes destroyed on-site
22Overnight shifts around live patient care
$420,280Client recovery credited to the health system
Read the full case study →
Technology · Colocation exit

How a software company exited two colocation sites four days early

ITAMG ran both exits in parallel, separated 88 lease returns and moved 24 complete GPU nodes directly into recovery before handback.

$2.9MClient recovery credited
$320,700Holdover rent avoided
9Days on site across both facilities
Read the full case study →
THE ITAMG PROOF

What Enterprise IT Leaders Say About ITAMG

ITAMG holds a 5.0/5.0 customer rating on Gartner Peer Insights and a 4.9 rating on Google Business.

Gartner
5.0 Read Our Reviews
Google
4.9 100+ Reviews

Healthcare and Biotech, Supply Chain, 10B-30B USD

"Being such a large organization with many custom needs, this company does it all with the highest quality and knowledge in the industry"

Banking, Engineering - Other, 30B+ USD

"ITAMG is a great company with amazing workers. They are easy to schedule and will work with you to come up with a solution on pretty much anything."

Healthcare and Biotech, IT, 500M-1B USD

"ITAMG will send staff on-site to help prep each shipment, these staff have always been nothing but professional in their interactions with my team."

Consumer Goods, Marketing, 50M-250M USD

"Return on capital, chain-of-custody, tracking, plus audit ready reporting"

GARTNER is a registered trademark and service mark of Gartner, Inc. and/or its affiliates in the U.S. and internationally, and PEER INSIGHTS is a registered trademark of Gartner, Inc. and/or its affiliates and are used herein with permission. All rights reserved. Gartner Peer Insights content consists of the opinions of individual end users based on their own experiences with the vendors listed on the platform, should not be construed as statements of fact, nor do they represent the views of Gartner or its affiliates. Gartner does not endorse any vendor, product or service depicted in this content nor makes any warranties, expressed or implied, with respect to this content, about its accuracy or completeness, including any warranties of merchantability or fitness for a particular purpose.

THE ITAMG DIFFERENCE

Why Enterprises Decommission Data Centers With ITAMG

ITAMG publishes the proof behind each of the six reasons below. The certifications and the customer rating are verifiable independently, in each issuing body's public directory.

Published Security Record

26+ Years. Zero Reported Data Breaches.

ITAMG publishes its breach record: zero reported data breaches since 1999. Ask every bidder on your decommission to state theirs in writing.

Public Breach RecordSince 1999Enterprise Scale
Compliance Controls

NAID AAA Certified. SOC 2 Compliant.

NAID AAA certifies ITAMG for both data erasure and physical destruction, and R2v3 governs downstream disposition. RIOS adds quality, environmental, and safety operating standards, and ITAMG maintains SOC 2 compliance across its security controls.

NAID AAAR2v3SOC 2 CompliantNIST 800-88 Rev. 2
Customer Reviews

Reviewed on Gartner Peer Insights

ITAMG holds a 5.0/5.0 customer rating on Gartner Peer Insights. The rating reflects customer reviews.

5.0/5.0 GartnerCustomer ReviewsCustomer-Scored
Own Crews, One Contact

ITAMG Crews on Every Site

Background-checked ITAMG technicians perform the de-installation, destruction, and packing, and one project manager owns your schedule end to end.

Background-Checked CrewsSingle Project ManagerNamed Project Responsibilities
Facility-Scale Cover

Insurance Built for Facility Risk

ITAMG carries general liability, cybersecurity liability, pollution liability, and errors-and-omissions coverage. A facility project deserves a vendor insured for facility-scale consequences.

General LiabilityCyber LiabilityPollution + E&O
One Rack to Hyperscale

No Minimums. No Maximums.

ITAMG decommissions single server rooms and hyperscale floors under the same certified process. Scope grows or shrinks without changing vendors.

No MinimumNo MaximumSame Certified Process
THE ITAMG OPERATION

Inside ITAMG Data Center Decommissioning Operations

ITAMG operates a 25,000+ sq ft processing facility with industrial shredding lines and runs its own crews on client sites nationwide. The photos below show the operation enterprise buyers tour before they sign.

R2v3-Certified Facility Operations
ITAMG team processing corporate laptops and servers for buyback program
ITAMG team processing corporate laptops and servers for buyback program
Technician Operating Shredding Equipment for Secure Hard Drive Destruction Inside a Mobile Shredding Unit
Technician Operating Shredding Equipment for Secure Hard Drive Destruction Inside a Mobile Shredding Unit
ITAMG 25,000+ sq ft R2v3-certified processing facility overview
ITAMG 25,000+ sq ft R2v3-certified processing facility overview
GPS-tracked transport vehicle loading enterprise IT equipment for ITAMG buyback
GPS-tracked transport vehicle loading enterprise IT equipment for ITAMG buyback
ITAMG R2v3-certified facility secure storage area for IT equipment
ITAMG R2v3-certified facility secure storage area for IT equipment
ITAMG technician transporting enterprise laptops through secure processing facility
ITAMG technician transporting enterprise laptops through secure processing facility
ITAMG 25,000+ sq ft R2v3-certified processing facility overview
ITAMG processing facility with enterprise IT equipment ready for buyback evaluation
7 photos from ITAMG's R2v3-certified processing facility
READY TO DECOMMISSION YOUR DATA CENTER?

Decommission Your Data Center With ITAMG

ITAMG delivers data center decommissioning services with data destruction and equipment buyback in one free, no-obligation quote. Proposals typically arrive within 2 business days after inventory and scope are confirmed, and one project manager owns the agreed schedule from walkthrough to final certificate. 26+ years. Zero reported data breaches. Call +1 877.625.4872 to speak with a decommissioning specialist directly.

R2v3 Certified. SOC 2 Compliant. Request a Project Quote.
Certified & Compliant R2v3 NAID AAA SOC 2 NIST 800-88 RIOS
5.0
Gartner Peer
Insights Rating
26+
Years in IT Asset
Disposition
13M+
IT Assets
Processed
50
States with
Pickup Coverage
Related Reading

Data Center Decommissioning Guides and Related Services

Deeper planning reading from ITAMG: process guides, standards explainers, and the services that border a data center decommission.

Download the decommissioning toolkit for the working Excel planner, or browse decommissioning locations and operator resources for site-specific coordination.

Data Center Decommissioning: A Security Checklist
Security Checklist

Data Center Decommissioning: A Security Checklist

The security controls to confirm before, during, and after a facility retirement, in checklist form.

Read the guide →
Ensuring Data Integrity and Access During Data Center Decommissioning
Continuity

Ensuring Data Integrity and Access During Data Center Decommissioning

How to keep the data you still need available while the hardware holding it is retired.

Read the guide →
An Introduction to NIST 800-88 and Media Sanitization
Standards

An Introduction to NIST 800-88 and Media Sanitization

How Clear, Purge, and Destroy map to wipe and shred decisions on retired drives.

Read the guide →
How Do I Get a Data Destruction Certificate?
Documentation

How Do I Get a Data Destruction Certificate?

What a certificate of destruction records, who issues one, and what auditors expect it to show.

Read the guide →
FAQ

Frequently Asked Questions About Data Center Decommissioning

Enterprise teams evaluating data center decommissioning companies ask the same questions: timeline, cost, standards, and proof. ITAMG answers the fifteen most common below, from NIST 800-88 sanitization to buyback credits.

What is data center decommissioning?
Data center decommissioning is the managed retirement of a facility's IT infrastructure: data destruction, de-installation, resale, and recycling. The work ends when every asset is reconciled and certified. ITAMG's data center decommissioning services run that full sequence under one chain of custody, from first inventory to closing report.
How long does data center decommissioning take?
ITAMG typically provides quotes within 2 business days after inventory and scope are confirmed. Project execution is typically about 10 business days; confirm the schedule against site readiness, access and the agreed work. Multi-site and hyperscale programs run on phased schedules set during planning. Timeline drivers include asset count, destruction method mix, and site access windows.
How much does data center decommissioning cost?
Data center decommissioning cost depends on asset volume, destruction method, site access, logistics distance, and schedule compression. Buyback offsets the total: ITAMG credits agreed recovery value against the project; the amount depends on the equipment and commercial terms. In all three published ITAMG data center decommissioning case studies, client recovery exceeded project cost. Request a free quote for a line-item number on your facility.
Should decommissioned drives be shredded or wiped?
ITAMG shreds end-of-life drives and wipes drives headed for resale; both methods run under NAID AAA with per-serial verification. Wiping follows NIST 800-88 Rev. 2. Failed or unsupported media follows an approved exception route. ITAMG can shred flash media to a 2mm particle size; the selected method must meet the media and security requirements. Either method runs at your facility or at ITAMG's, and the quote prices both.
What is a certificate of destruction?
A certificate of destruction is the signed record that a specific drive or device was destroyed, identified by serial number. ITAMG supplies serialized records for the approved erasure or destruction method plus a reconciliation report for the full inventory, delivered through a 24/7 client portal. The package stands as audit-ready disposition evidence.
Which regulations apply to data center decommissioning?
Applicable requirements depend on the data, organization and location. Your team may need to address HIPAA, HITECH, GLBA, SOX, GDPR, CCPA or FACTA, along with RCRA and state e-waste rules. Define the required controls and records during scoping. ITAMG supplies the agreed disposition evidence; a certificate does not by itself close every obligation.
What certifications should data center decommissioning companies hold?
Data center decommissioning companies should hold NAID AAA for data destruction and R2v3 for downstream disposition. ITAMG is certified to both standards and holds RIOS, which covers quality, environmental, and health and safety operations. Every one of those certifications is checkable in the issuing body's public directory, so ask any provider for its certificate numbers and verify them yourself.
What should a data center decommissioning RFP include?
A data center decommissioning RFP should require named certifications, proof of insurance, the staffing model, and per-serial reporting. Ask each bidder for its breach record in writing, and ask where destruction physically happens. ITAMG answers every criterion in its proposal. Score each bidder against the same list.
Can we decommission a data center in-house?
In-house data center decommissioning suits a small server room; at facility scale it concentrates data, safety, and disposal risk on internal teams. Certified destruction equipment, per-serial documentation, and resale channels are what a vendor amortizes across projects. ITAMG has completed 25,000+ projects across its IT asset retirement operations.
Does ITAMG buy back decommissioned data center equipment?
ITAMG buys back decommissioned servers, GPU systems, storage, and networking hardware and credits recovery value against project cost. ITAMG processes 6,000+ enterprise servers annually across its operations. Recovery for your project depends on the inventory, condition and agreed terms. Equipment without market value routes to certified R2v3 recycling.
Does ITAMG handle small server rooms as well as hyperscale facilities?
ITAMG decommissions everything from single server rooms to hyperscale, multi-site programs, with no minimum or maximum quantities. The same certified process, crews, and documentation apply at every scale, in all 50 states and globally through partners. Multi-region schedules run under one project manager.
Can ITAMG decommission GPU clusters and liquid-cooled infrastructure?
ITAMG decommissions Nvidia DGX, HGX, A100, H100 and L40 systems. Eligible GPU systems may return buyback value to the project budget. List liquid cooling loops, UPS units, PDUs, CRAC units and rack enclosures separately so ownership, acceptance and qualified specialist work can be agreed.
Does ITAMG serve healthcare, financial services, and government organizations?
ITAMG decommissions data centers for healthcare systems, banks, government agencies, and universities under each sector's rules. Verified Gartner reviewers include IT leaders at a 30B+ banking institution and healthcare organizations up to 30B in revenue. Framework mapping covers HIPAA, GLBA, SOX, and state requirements.
Does ITAMG support data center migration and relocation?
ITAMG coordinates decommissioning with data center migrations, relocations, and cloud transitions so retired hardware exits as new capacity arrives. IT relocation is a standing ITAMG service line. Assets marked for reuse move under the same GPS-tracked chain of custody that governs disposal.
How is data center decommissioning different from ITAD?
Data center decommissioning applies ITAD at facility scale: de-installation, data destruction, value recovery, and site closeout in one program. ITAD spans every device class across a company's lifecycle; decommissioning concentrates that discipline on the defined sites and adds removal logistics. Any restoration work must be included in the agreed scope. ITAMG delivers ITAD and decommissioning services.
Get Data Center Decomm Quote